Project description
The project aimed to remodel the water supply system of Pataias, starting at the Paredes lift station and up to the reservoirs of Lagoa (to be expanded) and Piscina (to be built). The following works were planned: remodelling of the Paredes lift station, replacement of the pre-existing feeder eduction pipe to Lagoa and Pataias, expansion of the Lagoa reservoir with the construction of a 500 m3 unit, construction of the 2800 m3 Piscina reservoir to serve the populations of Pataias, Ferraria, Alva de Pataias and Pataias-Gare, remodelling of the Pataias distribution networks. The water supply conduits extended over 4576,8 m and the water distribution network was 1180 m long.